Skip to content

Aspen Trail Reconstruction – Medicine Bow National Forest

About The Project

The Aspen Trail was an old user created trail.  It was highly eroded and falling apart.  TPT Trails was brought in to construct some minor reroutes, armor some highly eroded parts of the trail and reconstruct curves, drainages and muddy segments of the trail.  This required armoring over 500 lineal feet of trail, constructing numerous drainage features and building several large stone structures.

Project Images

Back To Top